The Factory Floor and the ERP Finally Speak the Same Language.

Bridge the gap between the dusty shop floor and the clean office. Connect NetSuite, Dynamics, and machine IoT data to a simple chat interface for supervisors.

Initialize Demo
Shop Floor Terminal 01
Machine 3 just went down. How does this affect the Ford order?
Analyzing production schedule...
IMPACT ANALYSIS:
Ford Order #552 will miss today's 4 PM shipping window.
New Estimated Completion: Tomorrow, 9 AM.
RECOMMENDATION: Move "General Motors Job #902" to Machine 2 to compensate. Proceed?
Yes. Do it.
AWAITING COMMAND...

Securely Integrated With

NetSuite MS Dynamics 365 Epicor SAP B1

Digitize Without Disruption

No new hardware. No engineering team needed. Just chat.

Real-Time Production Status

Stop calling the floor to ask "Are we on schedule?" Supervisors can query output metrics against daily targets instantly.

Downtime Response

When a machine breaks, understand the downstream impact immediately. Reschedule jobs in the ERP right from the floor.

Inventory on the Line

Don't run out of raw materials mid-shift. Check warehouse stock levels before starting a production run.

Data-Driven Operations

Floor Supervisor

Firefighting and resource allocation.

Plant Manager

High-level OEE and output tracking.

Sales Team

Order status without bothering ops.

> SUPERVISOR: "Re-calculate completion date for Job 114B based on current line speed." Calculating based on current OEE of 82%...

New ETA: Friday, 2:00 PM.
(Previous ETA was Friday, 10:00 AM).

> SYSTEM READY.
> PLANT MANAGER: "Show me overall equipment effectiveness for Line 3 this week." Querying production data...

Line 3 OEE: 78.5%
Availability: 92%
Performance: 88%
Quality: 97%

Note: Below target of 85%. Primary cause: 3 unplanned stops on Tuesday.

> SYSTEM READY.
> SALES: "When will Order #2847 for Johnson Manufacturing be ready to ship?" Checking ERP and production schedule...

Order #2847 Status:
- Current Stage: Final Assembly (85% complete)
- Estimated Completion: Tomorrow 11:00 AM
- Quality Check: Tomorrow 2:00 PM
- Ready to Ship: Tomorrow 4:00 PM

On track for Friday delivery commitment.

> SYSTEM READY.

Connect Your Shop Floor in 72 Hours.

No engineering resources required.

Schedule Assessment